Check before use

Update:2016-09-23

Before using the check: 1) and jet device connected to the pipe should be installed complete, valve set, complete and steam-water expansion device installed in place; 2) steam pipeline insulation integrity, hydrophobic normal; 3) ejector import and export of steam pipe, buffer tank body, water pipelines shall be complete with pressure, temperature monitoring instrument; 4) the condensate pipes should have flow control and shutoff valves, and complete with pressure and temperature monitoring instrument;

PREV:       NEXT: